May 7, 2026

The Ultimate Guide to Planning a Kitchen Renovation

A practical order of operations for a kitchen project, from first measurements through to the final walkthrough.

Two homeowners with paint rollers preparing a room for renovation

A kitchen renovation is a construction project wearing an interiors costume. Treating it in the right order is what keeps it calm.

One: measure and record

Get accurate dimensions including ceiling height, window reveals, and the position of every service. Photograph the walls before anything is covered up.

Two: agree the layout

Fix the position of the sink, the hob, and the fridge before anything else is decided. Everything downstream depends on those three.

Three: set the budget in bands

Split it into construction, cabinetry, worktops, appliances, and finishes, then hold a contingency separately. Bands make trade-offs visible.

Four: order long-lead items

Cabinetry, stone, and appliances first. Paint and handles can be decided while the first fix is happening.

Five: sequence the trades

Strip out, first fix, plaster, floor, cabinetry, template, worktop, second fix, decorate. Skipping ahead in this list is the most common cause of rework.

Six: snag properly

Walk the room in daylight with the drawers open. A good contractor expects a snag list and welcomes it.

Ready to take the next step?

Start your kitchen renovation with a team committed to quality and excellence.

Book Free Consultation

RALEIGH · DURHAM · CHAPEL HILL

FREE IN-HOME ESTIMATES

4.5 STARS FROM 52 GOOGLE REVIEWS

Expires in

Limited time offer

We rebuilt your site for you. Claim it and we handle everything transfer, hosting, and your domain. Then update it anytime, just by asking AI.

Host for only$8 per monthBilled yearly
Claim limited offer now